Erosion Controls protect the wetlands

Before the construction began on the sections that border the conservation lands, silt and animal barrier was installed on both sides. A trench is dug and the barrier is laid in and back filled. It remains until construction is completed.

No comments yet.

Leave a Reply

Protected by WP Anti Spam

Powered by WordPress. Designed by Woo Themes